The Grapevine
Open, with an advisory · open, but Caltrans has something to say
Right now
Open, with an advisory
Castaic1,280 ft
Pyramid Lake2,600 ft
OPEN, WITH AN ADVISORYTejon Pass4,144 ft
Lebec3,580 ft
Grapevine1,500 ft
99 split960 ft
There is a dense fog advisory in effect from from the Los Angeles/Kern Co Line to 5 mi south of the Jct of SR 99 /at Grapevine Rd/ (Kern Co) /the Grapevine/ - Motorists are advised to drive with caution
Source: Caltrans highway conditions · checked Today, 11:17 · Caltrans report of Monday, November 16th, 2026 at 11:17 AM
Planned and current lane closures
| When | Where | What |
|---|---|---|
| Nowuntil 21 Apr 2027 | Northbound, Route 5 to Tejon Pass Rest Area - NorthboundFull closure (off ramp), all lanes | Full closure (off ramp), all lanesMiscellaneous Work |
| Nowuntil 21 Apr 2027 | Southbound, Route 5 to Tejon Pass Rest Area - SouthboundFull closure (off ramp), all lanes | Full closure (off ramp), all lanesMiscellaneous Work |
| Nowuntil 26 Feb 2027 | Northbound, Lebec Rd Over-Crossing to Grapevine Road UndercrossingLane closure, lane 4 of 4 and right shoulder | Lane closure, lane 4 of 4 and right shoulderRoadway Excavation |
| Nowuntil 26 Feb 2027 | Northbound, Route 5 to Fort Tejon Over-CrossingFull closure (off ramp), all lanes | Full closure (off ramp), all lanesRoadway Excavation |
| Nowuntil 26 Feb 2027 | Northbound, Lebec Road Over-Crossing 50-271 to Route 5Full closure (on ramp), all lanes | Full closure (on ramp), all lanesRoadway Excavation |
| Nowuntil 26 Feb 2027 | Northbound, Fort Tejon Over-Crossing to Route 5Full closure (on ramp), all lanes | Full closure (on ramp), all lanesRoadway Excavation |
| Nowuntil 26 Feb 2027 | Northbound, Route 5 to Truck Escape Ramp (Right)Full closure (off ramp), all lanes | Full closure (off ramp), all lanesRoadway Excavation |
| Nowuntil Today, 12:59 | Southbound, General Petroleum Under-CrossingTraffic Break closure, all lanes | Traffic Break closure, all lanesBlasting |
| Today, 21:01until 17 Nov, 08:59 | Northbound, Grapevine Creek Bridge to General Petroleum Under-CrossingLane closure, lane 3 of 4 and right shoulder | Lane closure, lane 3 of 4 and right shoulderConcrete Pour |
| Today, 21:01until 17 Nov, 08:59 | Northbound, General Petroleum Under-Crossing to Grapevine Road UndercrossingLane closure, lane 3 of 4 and right shoulder | Lane closure, lane 3 of 4 and right shoulderConcrete Pour |
| Today, 21:01until 17 Nov, 07:59 | Southbound, Grapevine Under-Crossing to Grapevine Road UndercrossingLane closure, lanes 1, 2 of 4 and left shoulder | Lane closure, lanes 1, 2 of 4 and left shoulderK-rail Installation |
| 17 Nov, 00:01until 17 Nov, 04:59 | Northbound, Grapevine Creek Bridge to General Petroleum Under-CrossingLane closure, lanes 2, 3 of 4 and right shoulder | Lane closure, lanes 2, 3 of 4 and right shoulderConcrete Pour |
Source: Caltrans chain-control and lane-closure feeds · checked Today, 11:18
The other way round
Highway 58 over Tehachapi: Open
If both are shut, the long way is the 14 and the 395 round the east side. Caltrans by phone: 1-800-427-7623.
Recent changes
No status changes since we started watching.
Cameras
On the road
From Pyramid Lake up over the top and down to the 99 split
6